Set up the router table and routed all the dados in the face components. Then cut 2 vertical pieces to the length I needed and cut the tenon on the router table as well.
test fit
gluing up the first face
Checking the reveal
2nd face went on much easier. I used my pin nailer to tack it in place, then slid the drawer out and secured it with screws from the inside.
No comments:
Post a Comment